Featured Events

X

Select from the featured events lightboxes below to access curated content for the given topic.

dpaphotosseven145615

26 April 2024, Brandenburg, Schwarze Pumpe: View of the construction site for the H2-ready gas-fired power plant project at the Schwarze Pumpe industrial site on the border between Brandenburg and Saxony (aerial view with a drone). LEAG is planning extensive investments in H2-ready gas-fired power plants at its power plant sites in Brandenburg, Saxony and Bavaria to cover generation gaps in the wake of the German coal phase-out. Provided that construction and operation can be economically viable within the power plant strategy still to be developed, an H2-ready gas-fired power plant could be built at the Schwarze Pumpe energy site. LEAG is currently preparing the construction site on a suitable company-owned area within the Schwarze Pumpe industrial park for possible construction. Photo: Patrick Pleul/dpa
Location: Schwarze Pumpe, Brandenburg, Germany
Post Date: Apr 26, 2024 7:10 AM
TAG ID: dpaphotosseven145615 (RM)
Credit: Patrick Pleul/dpa/picture-alliance/Newscom
Format: 7758 x 5912 Color JPEG
Photographer: Patrick Pleul
Keywords: Construction, Industry, Gas, lsn, Saxony, Lignite, Lusatia, Structural change, Power station, Future, Hydrogen, Hydrogen power plant, Gas-fired power plant, Building site, Aerial photo
Release Status: No Model Release, No Property Release
Select File Name Dimension File Size Type Usage Price (USD)
Watermark No Charge   
Please submit a licensing request for pricing on this usage.