Location:
Huidong, , CHINA
Post Date:
Jun 29, 2020 9:10 AM
TAG ID:
xnaphotostwo241559
(RM)
Credit:
Hu Chao / Xinhua News Agency/Newscom
Format:
8192 x 2734 Color JPEG
Photographer:
Hu Chao
Keywords:
cn, jt
Release Status:
No Model Release, No Property Release
Caption:
(200629) -- HUIDONG, June 29, 2020 (Xinhua) -- Aerial photo taken on June 29, 2020 shows a view of the Wudongde Hydropower Station on the border of Sichuan and Yunnan provinces in southwest China. The first group of electricity-generation units at the Wudongde Hydropower Station was put into use on Monday. The station, which is located on the border of Sichuan and Yunnan provinces in southwest China, has a total installed capacity of 10.2 million kilowatts, with the estimated annual power generating capacity of 38.91 billion kilowatt-hours. All electricity-generation units are expected to be put into use by July in 2021. Spanning the Jinsha River, the upper stretches of the Yangtze River, the station is a major hydropower project to promote high-quality development of the Yangtze River Economic Belt. (Xinhua/Hu Chao)