Location:
Wolmirstedt, Saxony-Anhalt, Germany
Post Date:
Nov 9, 2020 8:10 AM
TAG ID:
dpaphotosfour801914
(RM)
Credit:
Stephan Schulz/dpa/picture-alliance/Newscom
Format:
6016 x 3384 Color JPEG
Photographer:
Stephan Schulz
Keywords:
Electricity, South-East Link, Southeast link, South East Link, South-EastLink, Power line, Overhead lines, Overland line, Power lines, energy, Economy, Company, Infrastructure, Sky, clear, cloudless, blue, Twilight
Release Status:
No Model Release, No Property Release
Caption:
07 November 2020, Saxony-Anhalt, Wolmirstedt: At the transformer station, electricity pylons are placed close together. From here, a 580-kilometer long power line from Saxony-Anhalt to Bavaria, the so-called Southeast Link, is to be built. The project is planned by the company 50Hertz. Photo: Stephan Schulz/dpa-zentralbild/ZB